Generator plantroom with stainless steel exhausts and silencer installed by Grün

Commercial & industrial · UK & Ireland

FLUES · CHIMNEYS · STEELWORK · SILENCERS

You don’t wait for us. We wait for you.

2026 projects

Where we've worked.

334 projects across the UK and Ireland. Gold stars are flagship projects. Numbered circles are groups of jobs: select one to zoom in, then select a dot to see the job.

Type
Area

Scroll or pinch to zoom, drag to move around, or use the area buttons and + / −. Dots are placed at town level, or by London district where the job makes it clear, and jobs in the same town are spread out so each can be selected. Nearby jobs are grouped into numbered circles until you zoom in. 3 jobs with no town on the register are not shown.

UK & Ireland

Select a circle or dot.

A numbered circle zooms in to the jobs it holds. A dot shows the job. Every job in view is also listed below, flagship projects first.

In view: 334

Flagship projects

Other jobs in view

Grünbot

Ask about turnaround times, pricing information, testing and documents.

Answers come from information Grün has written and checked. Anything it can’t answer goes straight to the team, with your drawings if you have them.

Grünbot Checked answers from the Grün team
Hi, I’m the Grün bot. Ask me anything about our flue, chimney, steelwork and silencer work, or pick a question below.

On site

What it's like working with us...

Survey, design, materials, installation and project documentation. Explore the services and project stories for written details.

Our services

What we do.

Send drawings

Finished properly, and checked by a supervisor on every project.

See the finishing
  • Stainless cover plate sealed round a flue at the base of a brick chimney
  • Storm collar on a liner terminal and a cap plate sealing the chimney top
  • Storm collar and weathering plate at a flat roof, with end caps on the support channel
  • Polished roof terminal with a storm collar where it meets the roof
  • Twin wall flue leaving a building through a wall plate, then up the brick wall on brackets
  • Exhaust silencer hung from the soffit on threaded rods and channel

How it works

From drawings to handover.

  1. Send drawings Or photos, or an outline
  2. Survey Measured and photographed
  3. Drawings Normally within 60 minutes of survey
  4. RAMS Normally same day
  5. Install Daily photo reports
  6. Test Tested and recorded
  7. Handover O&M pack

Get in touch

Three ways to start.

Send drawings

Request a call back

Join the mailing list

Or call 01395 201950 · sales@gruneng.com

Project evidence

Industrial chimneys.
Complex exhaust routes.

Explore all projects ↗

Digital working

Fast admin.
Proper engineering.

Digital survey capture feeds our drawing and RAMS process. Our own tools help us turn information into useful project documents quickly.

Customers receive clear drawings, job-specific RAMS and daily photo progress reports. Completion documents are normally with customers before the engineers get home.

Explore an engineering drawing ↗

Coverage

UK and Ireland.

Head office in Exmouth, Devon. Engineers based in the Midlands. We work with contractors and project teams across England, Scotland, Wales and Ireland.

See the sectors we work in ↗

Drawn by Grün

See how the details connect.

Plantroom flue arrangement drawing produced by Grün Open the drawing explorer ↗

The route. The connections. The supports.

Our drawings help the project team review the installation before work starts. Explore enlarged views from existing approval drawings.

Illustrative drawing exports. Project issue status is shown in the explorer.

Organised from the start

Speed you can see.

60
minutes

Drawings normally back within 60 minutes of survey.

Same
day

Job-specific RAMS normally turned around the same day.

Daily
updates

Photo progress reports from site.

Follow the delivery process ↗

Your next project

Send what you have.

Drawings, photographs, appliance details or an outline of the job. We will review it and identify what we need next.